Gate 304 smart access pilot
Face, alcohol and PPE checks at the Olefins Plant gate. The AI runs on the devices, and every result goes back to CSM.
See our design in 3D- 4lanes
- 2alcohol stations
- 20devices
- 3 molive pilot
The rule at each point
Entry fails keep the gate shut. Exit fails are logged and the gate still opens.
| Check | Alcohol station | Entry lane | Exit lane |
|---|---|---|---|
| Face match | Identifies | Required | Required |
| CSM: allowed at G-304 for this job | — | Required | — |
| Alcohol, zero tolerance | Test taken | Result required | — |
| Helmet | — | Required | Logged only |
| Safety shoes | — | Required | Logged only |
| Health check | Connection only | If a device is added | — |
| When a check fails | FAIL goes to CSM | Gate stays shut, guard alerted | Gate opens, violation to CSM, TV and guard |
Questions for the call
From the agenda, each with what LSP's draft already says.
32 edge cases to settle
None are in the draft or the agenda. Ask the five marked in orange first.
Three layers, AI on the device
The face terminal matches faces and the PPE camera checks helmet and shoes, so there is no AI server.
Will two alcohol stations keep up?
LSP's targets are 15 s per alcohol test and 5 s per lane. Set the shift change to see the queue.
Inferred from LSP's targets, not measured. The pilot will measure real times.
Pilot plan and how it's judged
Durations are marked TBC in the draft. LSP decides at month 3: accept, extend or stop.
ThenTFU gates 1 and 2 · Tank FarmPO-G1 · PolyolefinsSame design, 8 to 12 weeks per gate